Modular jack-up barges

Modular jack-up barges that ship in containers

A jack-up barge is usually one hull, so it has to be towed or carried whole on a heavy-lift ship. Our modular barges divide the hull into pontoons the size of shipping containers. They travel by ship and truck like any container cargo, and are assembled at the port where they arrive.

Singapore 路 Assembly on site 路 2023.07

Why modular

  • Each pontoon has the footprint of a standard container, so it travels on container ships and trailers.
  • On arrival a crane lowers the pontoons into place, they are pinned together, and the legs (spuds) and jacking units are fitted before jacking up.
  • After the job the barge can be taken apart and moved to the next site, and pontoons can be added or removed to change the platform size.
Assembly animation Pontoons arrive as container cargo and are joined on the water.

Pontoon sizes (MI-m200T as an example)

As listed in the MI-m200T specification. The width and length of each pontoon match the footprint of a 40-foot or 20-foot container.

PartSize (W 脳 L 脳 H)Quantity
A pontoon2,438 脳 12,190 脳 2,581 mm10
B pontoon2,438 脳 6,095 脳 2,581 mm4
Jacking pontoon2,438 脳 6,095 脳 2,581 mm4
Spud (leg)脴1,220 mm, 3 sections of 12 m4

From shipping to jacking up

  1. Packing and shipping

    Pontoons, spuds and equipment are loaded into containers and onto trailers at our factory.

    • Gunsan factory 路 Shipped in containers 路 2016.10
      Gunsan factory 路 Shipped in containers 路 2016.10
    • Gunsan factory 路 Shipped in containers 路 2017.09
      Gunsan factory 路 Shipped in containers 路 2017.09
  2. Assembly at the port

    The pontoons are unloaded and joined one by one, on the quay or on the deck of a barge.

    • Singapore 路 Assembly on site 路 2023.07
      Singapore 路 Assembly on site 路 2023.07
    • Hong Kong 路 Assembly on site 路 2016.12
      Hong Kong 路 Assembly on site 路 2016.12
  3. Fitting the legs

    The spuds and jacking units are fitted and the equipment is checked.

    • Singapore 路 Assembly on site 路 2023.07
      Singapore 路 Assembly on site 路 2023.07
    • Singapore 路 Assembly on site 路 2023.07
      Singapore 路 Assembly on site 路 2023.07
  4. Jacking up

    The barge is floated to the site, the legs go down and the hull is lifted clear of the water.

    • Singapore 路 At work 路 2023.10
      Singapore 路 At work 路 2023.10
    • Hong Kong 路 Installation 路 2016.12
      Hong Kong 路 Installation 路 2016.12

Tell us where it needs to go

Give us the destination port, the water depth on site and the deck area you need, and we will suggest a model and a way to ship it.